Medical physics is most useful when it is part of the project plan, not a last minute box to check before opening. New construction, scanner replacements, and room renovations can involve shielding, testing, and required documentation.

Start with the right context.

Start with an equipment list, preliminary floor plans, room use, intended installation schedule, and the applicable accreditation program. Discuss shielding needs before construction is complete, then coordinate any acceptance testing after installation and before clinical use as applicable.

Make the next step easier.

A simple early conversation can clarify scope, dependencies, and the sequencing between architects, service engineers, facility managers and the physics provider. Different modalities have different testing and safety considerations.

Technical reference

Requirements change and vary by modality. Confirm the applicable requirements with a qualified professional and your accrediting organization.

Have a question?

Let's talk through your equipment.

Ask Vaughn Physics